Leak-tightness testing with air or water

Standard-compliant proof that wastewater pipes and manholes are leak-tight: tested to SN EN 1610 with air or water, with a test report for the municipality, site management and owner.

Pressure gauge and test equipment for the leak-tightness test of a wastewater pipe

In brief

A leak-tightness test is the standardised proof that drain pipes and manholes are leak-tight, required for new buildings, after rehabilitation or by official order. Karo Kanaltechnik tests to SN EN 1610 with air or water. The pipe run is sealed with pipe stoppers, the pressure drop measured and the result recorded in a standard-compliant test report.

Standard-compliant leak-tightness testing for safety and proof

A leak-tightness test proves that a wastewater pipe or a manhole is leak-tight: no wastewater escapes into the ground, and no groundwater or seepage water enters the pipe. It is an essential part of quality assurance for drainage systems – as an acceptance test for new buildings, as a check on the result after rehabilitation work, or when the municipality requires proof.

We test to SN EN 1610, using both methods the standard recognises: with air (method L) or with water (method W). The air pressure test is faster, needs no water and can be carried out in almost any weather. The water pressure test makes sense where sealing for an air test is difficult, for example in manholes. We discuss which method is right with you or your site management in advance.

Testing is done pipe run by pipe run, i.e. each section of pipe between two manholes or openings. We seal the section at both ends with pipe stoppers, build up the test pressure and measure over the specified test period whether the pressure holds or how much water has to be topped up. Per pipe run, this takes approx. 30 to 60 minutes including preparation.

After every test you receive a standard-compliant test report with the method, measured values and a clear assessment: passed or failed. If a pipe fails, we do not stop at the finding: with a CCTV drain survey we find the leaking point, repair it – often without digging – and then test again until proof is available.

Our services at a glance

  • Leak-tightness testing to SN EN 1610 with air (method L) or water (method W)
  • Testing of underground drains, main pipes and house connections
  • Testing of inspection chambers and special structures
  • Acceptance tests for new buildings and after rehabilitation
  • Testing of individual pipe runs or entire network sections
  • Pre-cleaning and preliminary CCTV survey if required
  • Standard-compliant test reports for the municipality, site management and owner
  • Testing of existing pipes with temporary shut-off of the inflows
  • Advice if a test is failed, and a rehabilitation recommendation
  • Regularly calibrated test equipment

Pricing

per hour
CHF 160
call-out
CHF 60
CCTV survey
from CHF 50

Guide prices, excl. VAT.

Guide prices excl. VAT: CHF 160 per working hour plus a CHF 60 call-out fee. A single pipe run is usually tested in 30 to 60 minutes including preparation; a prior camera check is added as a surcharge from CHF 50. For entire network sections, we tell you the effort involved in advance – see the worked example below.

Areas of application

  • New building projects (acceptance test)
  • After rehabilitation work (verifying the result)
  • Tests ordered by the authorities
  • Change of ownership and condition surveys
  • GEP reviews of property drainage systems
  • Suspected leaks or infiltration water

24/7 emergency service

You can reach us around the clock – including weekends and public holidays.

+41 43 588 12 08
Process

How it works

From enquiry to completion – transparent and structured.

1

Clarification

We clarify the reason, the pipe plan, the number of pipe runs and the right method (air or water), and tell you the effort involved in advance.

2

Preparation

If required, we clean the pipe and check it with the camera so that obvious damage is known before the test.

3

Sealing off

The pipe run to be tested is sealed at both ends with pipe stoppers; inflows are shut off during the test.

4

Building up pressure

We build up the test pressure with air or water and wait for the stabilisation period until conditions have settled.

5

Measurement

Over the specified test period, we measure the pressure drop (air) or the water that has to be added (water) and record the values.

6

Report

You receive the standard-compliant test report with the assessment passed/failed – ready for acceptance and the municipality.

Advantages

Why Karo Kanaltechnik?

Standard-compliant

All tests to SN EN 1610 – with a report for the municipality, site management and owner.

Precise measurement

Regularly calibrated test equipment for reliable and reproducible results.

Air or water

We offer both test methods and recommend the more suitable one for your situation.

Immediate report

You receive the test report straight after the test – ready for acceptance.

FAQ

Frequently asked questions

For new buildings, SN 592 000 and SIA 190 require it as an acceptance test before the pipes are covered. Beyond that, it is required after rehabilitation work, on a change of ownership, by official order or as part of GEP reviews (general drainage plan). Which pipe runs must be tested is usually set out in the building permit or by the municipality; we clarify this with you or your site management in advance.

With both. The standard SN EN 1610 provides for testing with air (method L) and with water (method W). The air pressure test is quicker, needs no water and can be carried out in almost any weather. The water pressure test makes sense where an air test is difficult to seal, for example in manholes. We discuss the right method with you in advance.

Testing is done pipe run by pipe run, i.e. one section between two manholes or openings at a time. We seal it at both ends with pipe stoppers, build up the test pressure with air or water and wait for the stabilisation period. We then measure the pressure drop or the water that has to be added over the specified test period and record the values in the test report.

Per pipe run, the test including preparation takes approx. 30 to 60 minutes. For a single-family home with only a few pipe runs, the test is therefore usually completed in half a day; larger developments with many pipe runs and manholes are planned over several appointments, coordinated with the construction progress. You receive the test report immediately afterwards.

We advise you on the possible causes and recommend suitable measures. Leaks can often be located by camera inspection and repaired in a targeted way, in wastewater pipes often without digging using a patch liner. After the repair we test the pipe run again so that you can present a passed test report to the municipality or site management for acceptance.

Our test reports follow the standard SN EN 1610 and contain all the information that municipalities and site managers require for acceptance: pipe runs tested, method, test pressure, test duration and result. If your municipality requires a specific form or an additional CCTV drain survey, we clarify this before the test so that the report is right the first time.

Enquire without obligation

Fill in the form – we will get back to you within 24 hours.

Subject / service *

Need help fast?

Our emergency team is ready around the clock – including Sundays and public holidays.

Mandatory or voluntary?

When is a leak-tightness test mandatory?

For new pipes, the leak-tightness test is part of acceptance: the Swiss standard for property drainage, SN 592000, and SIA 190 require proof that pipes and manholes are leak-tight. This is based on the Waters Protection Act (GSchG): owners of wastewater installations must ensure that these are properly built, operated and maintained.

For existing pipes there is no blanket answer. Whether and when proof is required is regulated by the canton and the municipality – in the drainage regulations or in the general drainage plan (GEP). If in doubt, ask your municipality; we then test exactly what is required.

Required

New building

New property drainage pipes are tested for leak-tightness before acceptance (SN 592000, SIA 190) – ideally before the trench is backfilled.

Standard practice

After rehabilitation

After CIPP lining, patch liner or trench repairs, the test proves that the rehabilitated section is leak-tight again – as a check on the result before acceptance.

Depends on the municipality

Existing pipes

Whether and when proof is required, for example as part of the GEP or by official order, is determined by the canton and the municipality. Your municipality's drainage regulations are decisive.

Recommended

Purchase, sale, suspicion

On a change of ownership, or with infiltration water, smells or subsidence above the pipe, the test provides clarity – before a leak turns into damage.

In detail, with all situations and standards: Leak-tightness testing to SN EN 1610 – when is it mandatory?

Standard

Procedure to SN EN 1610: air or water

SN EN 1610 governs the installation and testing of drains and sewers. It permits two methods: air or water. With both, the pipe run – cleaned beforehand where necessary – is sealed with pipe stoppers; the standard specifies the test pressure, test period and permissible values. Measurement only begins once pressure and temperature have settled after the stabilisation period.

Method L

Air pressure test

The sealed pipe run is pressurised with compressed air. After the stabilisation period, the pressure drop is measured over the test period. The standard defines several test levels for this (LA to LD); the test pressure and test period depend on the method, pipe diameter and material.

  • Fast and without water consumption
  • Possible in almost any weather
  • Proven for pipes and pipe runs

Method W

Water pressure test

The pipe run or manhole is filled with water and put under test pressure. After the pre-filling period, the amount of water that has to be topped up to maintain the pressure is measured over the test period. If the amount is within the permissible value, the test is passed.

  • Suitable for manholes and special structures
  • Clear proof via the water added
  • Needs water and more time

And if the pipe fails the test?

Then we look for the leaking point with a CCTV drain survey or leak detection. Individual defects such as cracks or a displaced joint can often be sealed without digging using a Pointliner, entire pipe runs with drain rehabilitation. We then test again – only a passed report closes the case.

Proof

The test report

The test report is the real purpose of the leak-tightness test: it proves to the municipality, site management, buyer or insurer that the pipe was leak-tight at the time of the test. You receive it straight after the test so that acceptance does not have to wait.

Keep the report together with the pipe plans. In the event of a later sale, a conversion or an enquiry from the municipality, the proof is then immediately to hand. If a camera inspection was carried out beforehand, the findings to SN EN 13508-2 are also enclosed.

What the report contains

  • Property, client and date of the test
  • Tested pipe run (from manhole to manhole), length, diameter and material
  • Test method to SN EN 1610 (air or water) with test pressure and test period
  • Measured pressure drop or water added
  • Assessment: passed or failed
  • Name and signature of the tester
Prices

How much does a leak-tightness test cost?

We charge by time and effort, with fixed guide prices: CHF 160 per working hour plus a CHF 60 call-out fee, excl. VAT. A single pipe run is usually tested in 30 to 60 minutes including preparation. If the pipe is to be checked with the camera beforehand, a surcharge from CHF 50 is added.

What determines the effort: the number of pipe runs and manholes, the method (air is faster than water), the accessibility of the manholes and whether the pipe has to be cleaned first. For entire network sections or housing developments, we tell you the range before work starts.

Worked example

Leak-tightness test of one pipe run with air: one working hour including preparation, plus the call-out.

1 working hourCHF 160.00
Call-out (one-off)CHF 60.00
Total excl. VATCHF 220.00
VAT 8.1%CHF 17.82
Total incl. VATCHF 237.82

Guide price. We charge for the actual work; camera check as a surcharge from CHF 50, any cleaning and materials are charged separately.