Drain rehabilitation · Canton of Zurich · no excavation

Drain rehabilitation Zurich

Drain rehabilitation in Zurich without tearing up the back courtyard: we inspect your wastewater pipe with a camera, show you the findings and repair cracks, roots and displaced joints from the inside – with a CIPP liner, a patch liner or spray lining.

  • CCTV survey as the basis
  • CIPP liner, patch liner, spray lining
  • Up to 10 years' guarantee

In brief

At Karo Kanaltechnik, drain rehabilitation in Zurich starts with a CCTV drain survey. Only the findings decide the method: a CIPP liner for pipes damaged along their entire length, a patch liner for individual damaged spots, spray lining for narrow pipes inside the building. The work is done from the inside, without digging. We give a warranty of up to 10 years on rehabilitation work and quote the price after the survey.

Why Zurich's drains need rehabilitation

In many Zurich properties, the wastewater pipe is the oldest component in the building. The kitchen and bathroom have been renewed two or three times, while the underground drain beneath the floor slab has been in the ground since the building was built. This is particularly evident in the densely built-up neighbourhoods around District 4, in Wiedikon, Wipkingen or Oberstrass: apartment buildings from around 1900, pipes made of vitrified clay or concrete, and joints whose seals lost their elasticity long ago.

The damage patterns repeat themselves: longitudinal and transverse cracks, displaced joints, roots from courtyard trees growing in through leaking joints, and deposits that narrow the cross-section. Often this is only noticed when the basement is wet after a thunderstorm or a drain keeps getting blocked. In older parts of the city, many pipes carry foul water and rainwater together (combined system) – so in heavy rain, a damaged pipe quickly comes under pressure.

Trenchless rehabilitation where space is tight

In the city, digging is rarely a good solution. Between the façade and the pavement there is a narrow front garden, a paved courtyard entrance, an underground car park or other utilities' pipes and cables. Every metre of open trench means breaking up the surface, removing excavated material, protecting utility lines and restoring everything at the end – plus noise, dust and blocked access for all tenants.

With trenchless rehabilitation, we work through the existing access points: the inspection chamber, a rodding eye in the basement or the connection at the property boundary. The material is brought through the pipe to the damaged spot, and the surface stays untouched. For property management companies and condominium owners' associations, this is often the deciding factor, because the building remains habitable during the work and the pipe is out of service only briefly.

CCTV first: the findings decide

Before we propose a method, we clean the pipe with chemical-free high-pressure water jetting at up to 200 bar and run the CCTV camera through it. Every defect is recorded with its position in metres, an image and a code according to SN EN 13508-2. This shows whether a single spot needs repairing, the whole pipe run needs lining or a section has to be renewed by open-cut construction after all.

You receive the report with footage in every case – even if the pipe is in good order. In Zurich it is often needed before a purchase, when the property management changes, before a soil stack renovation or as evidence for the municipality. How defects are graded is explained in the article on condition grades.

Responsibility and permits in Zurich

The owners are responsible for the pipes on their own property, from the floor drain in the basement to the house connection to the public sewer. The city is responsible for the public sewer. Where your private pipe ends and which obligations apply is set out in the municipality's drainage regulations – in Zurich just as in Winterthur, Uster or Dietikon.

In many cases, trenchless rehabilitation on private land is possible without a building application. However, work on the connection to the public pipe, on public land or on a property in a groundwater protection zone may require notification or a permit. We clarify this with the responsible office before the quote and submit the CCTV survey report if it is required.

What drain rehabilitation in Zurich costs

Reliable prices per metre can only be given after the inspection. The decisive factors are diameter, length, the number of bends and lateral connections, accessibility and the chosen method. A patch liner for a single joint is usually charged per spot, a CIPP liner over an entire pipe run per metre. The guide Drain rehabilitation: cost per metre shows which factors drive the price.

We charge the CCTV drain survey in advance on a time basis: CHF 160 per hour plus a CHF 60 call-out fee, plus the CCTV surcharge from CHF 50 (all prices excl. VAT). You then receive a written quote for the rehabilitation itself, so that you can compare and decide together with the property management or your co-owners.

From Wiedikon across the whole region

Our base in Zurich Wiedikon is at Saumstrasse 27. From there we work in all city districts, in the Limmattal, around Lake Zurich and in the Glattal. Our branch at Bahnhofplatz in Winterthur covers Winterthur and the Weinland. For drain cleaning throughout the canton, see the overview under Canton of Zurich.

Methods

Three methods for drain rehabilitation in Zurich

CIPP liner

A resin-impregnated liner is pulled into the cleaned pipe and cures there. The result is a seamless pipe within the old pipe – for pipes with cracks or leaking joints along their whole length.

Patch liner (Pointliner)

A short sleeve is moved to the damaged spot with a packer and pressed into place. For individual cracks, a displaced joint or a spot with root ingress.

Spray lining

The inner wall is coated with resin. Suitable for narrow pipes inside buildings with many bends and branches, through which a liner can hardly be guided.

Procedure

How drain rehabilitation works in Zurich

  1. 01

    Enquiry

    You describe the problem; we clarify access, plans and the appointment.

  2. 02

    Cleaning & CCTV survey

    High-pressure jetting up to 200 bar, then a camera survey with a report to SN EN 13508-2.

  3. 03

    Findings & quote

    We discuss the footage and give you a written quote for the right method.

  4. 04

    Rehabilitation

    Installation of the liner or coating via the manhole or cleaning opening, without excavation.

  5. 05

    Handover

    Final camera survey, footage for you – up to 10 years' guarantee.

Frequently asked questions about drain rehabilitation in Zurich

What is the difference between pipe and drain rehabilitation?+

Pipe rehabilitation usually concerns the pipes inside the building, i.e. soil stacks and the connections from kitchen, bathroom and toilet. Drain rehabilitation concerns the buried pipes: the underground drain beneath the building and the house connection to the public sewer. The methods overlap, and in old Zurich buildings we often rehabilitate both in a single job.

How can I tell that my pipe needs rehabilitation?+

Typical signs are drains that keep getting blocked despite cleaning, gurgling noises, a drain smell in the basement, damp walls after heavy rain or rats in the courtyard. You only know for sure after a CCTV drain survey, which documents the condition with images and positions.

Is a pipe rehabilitated without digging as stable as a new pipe?+

A cured CIPP liner forms a self-supporting, jointless pipe inside the old pipe, which no longer depends on the seals of the old joints. The inspection shows whether the old pipe still has enough shape for this. If a pipe has collapsed or is severely deformed, we recommend renewing that section by open-cut construction.

Do I need a permit for drain rehabilitation in Zurich?+

On private land, trenchless rehabilitation is often possible without a building application. Work on the connection to the public pipe or on public land may require notification or a permit. The municipality's drainage regulations are decisive; we clarify this before the quote.

Can tenants stay in the building during the rehabilitation?+

Yes. We work via manholes and rodding eyes, not inside the flats. While a pipe section is being rehabilitated, it must not be used. We agree the time frame with the property management in advance so that they can inform the tenants.

What guarantee does Karo give on the rehabilitation?+

We give a warranty of up to 10 years on rehabilitation work. Once the work is finished, we run the camera through the pipe again and hand you the final footage as evidence.

Request drain rehabilitation in Zurich

First the camera, then the quote. You know beforehand what will be done and why.

Drain rehabilitation in other regions: St. Gallen · Thurgau · Aargau